Sunrise Group Industrial Co., Ltd.
|
Price: | 10.0 USD |
Payment Terms: | T/T,WU |
Place of Origin: | Guangdong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Super price electric brake
Electromagnetic brake operation principle:
Permanent magnetic brake designed for industrial and mobile applications. Brake force is produced via magnets which reduce both size and weight of brake versus spring applied brakes. Armature is mounted via springs which eliminates backlash. Standard brakes can accommodate temperatures up to 140deg C. Brakes can be tuned to provide a controlled stop. Output assemblies easily modified to fit your application.
Electromagnetic brake data:
Model | FBD-1-006 | FBD-1-015 | FBD-1-025 | FBD-1-050 | FBD-1-100 | FBD-1-200 | FBD-1-400 |
Static Torque[kgf-m(N-m) | 0.6(6) | 1.5(15) | 2.5(25) | 5(50) | 10(100) | 20(200) | 40(400) |
Dynamic Torque [kgf-m](N-m) | 0.5(5) | 1.0(10) | 2.0(20) | 4.0(40) | 8(80) | 16(160) | 32(320) |
Power [DC24 V] (W) at 20°C | 11 | 15 | 20 | 25 | 35 | 45 | 60 |
Weight | 0.32 | 0.58 | 1.07 | 1.97 | 3.45 | 7.1 | 12.2 |
Maximum speed (r/min) | 1800 |
1. When can I get the quotation?
We usually quoted within 24 hours after receiving your inquiry. If you are very urgent to get the price, please call us or tell us in your email, so that we can regard your inquiry priority.
2. How should I place the order?
Please let us know the model number based on our specs for powder clutch, powder brake, air clutch, air brake, electromagnetic clutch, electromagnetic brake and safety chucks. For air shaft and roller, please show us your drawing, or let us know your request, and then we will provide you drawing for confirmation.
3. What's your MOQ basis?
Normally, we don't have MOQ request, except the rollers.
4. What about the lead time for production?
Honestly, it depends on the order quantity and the type of our products. For powder clutch, powder brake, tension controller, load cell and edge position controller which is about 3-5 days. For safety chucks, air shaft and roller which need about 15-30days.
5. What is the term of delivery?
We can arrange with EXW, FOB, CIF…etc. You can choose the most convenient one or cost-effective way.